Steps to Installing Solar Panels with a Reliable Solar Company in Assam
- khanumar5436
- 2 days ago
- 4 min read

As Assam embraces a clean energy future, more homeowners and businesses are switching to solar power to reduce their electricity bills and environmental footprint. The abundant sunshine across most parts of the state makes solar energy a practical and cost-effective solution for both urban and rural settings.
Solar Panels are now more accessible than ever, thanks to government subsidies, financing options, and the growing presence of reliable solar companies in Assam. However, the success of a solar installation depends heavily on proper planning, accurate system design, and trustworthy installation partners. Whether you’re looking to power your home, office, or a commercial unit, following the right steps ensures a smooth and efficient transition to solar energy.
✅ Step-by-Step Guide to Installing Solar Panels in Assam
1. Assess Your Energy Needs
Begin by reviewing your past electricity bills to understand your average monthly consumption. This will help determine the size (kW capacity) of the solar system you need. Homes generally require systems between 1 kW to 5 kW, while commercial setups may need 10 kW or more.
2. Conduct a Site Survey
A reliable solar company will offer a free or low-cost site survey. During this visit, they assess:
Roof space and orientation
Shading from trees or buildings
Structural integrity of your roof
Wiring and grid connectivity
This is a critical step for determining the viability and placement of your Solar Panels for maximum efficiency.
3. Choose the Right Solar Company
Look for installers who:
Are MNRE (Ministry of New and Renewable Energy) approved
Have a physical presence or service network in Assam
Offer end-to-end services (survey, design, subsidy support, installation, and maintenance)
Provide good warranty coverage (preferably 25 years for panels and 5–10 years for inverters)
Some reputed names in Assam include Tata Power Solar, Loom Solar, and several local AEDA-registered companies.
4. System Design and Proposal
After the survey, your installer will create a customized proposal. This includes:
System capacity and layout
Estimated energy generation
Cost breakdown (with and without subsidy)
ROI and payback period
Equipment details (panel brand, inverter, battery if applicable)
Ensure that the proposed Solar Panels meet BIS standards and come with certifications.
5. Apply for Government Subsidy
The Indian government offers subsidies of up to ₹78,000 under the PM Surya Ghar Muft Bijli Yojana for residential rooftop solar. The process includes:
Online application via the National Solar Rooftop Portal
Site inspection and approval by your DISCOM (like APDCL)
Installation by an empaneled vendor
Final inspection and subsidy disbursement
Your solar company should assist with the documentation and application process.
6. Installation and Net Metering
Once approved, installation typically takes 3–10 days depending on the system size. Steps include:
Mounting the panels on your roof
Installing the inverter and electrical wiring
Connecting to your existing electrical system
Setting up net metering (to export excess power to the grid)
The net meter helps track energy import/export and calculates billing accordingly.
7. Testing and Commissioning
After installation, the system undergoes testing to ensure it meets safety and performance standards. This includes:
Checking voltage output
Verifying inverter connectivity
Ensuring no leakage or faults in wiring
Your DISCOM will also perform a final inspection before granting permission to operate (PTO).
8. Monitoring and Maintenance
Modern solar systems come with app-based monitoring tools, allowing you to track daily and monthly generation. It’s advisable to:
Clean your panels monthly to remove dust and bird droppings
Schedule annual maintenance with your solar company
Check inverter performance regularly
Most reliable installers offer 5–10 years of free maintenance and extended service contracts.
💰 Cost of Solar Panel Installation in Assam (2025 Update)
System Size | Average Cost (Post Subsidy) | Monthly Savings | ROI Timeframe |
1 kW | ₹35,000 – ₹45,000 | ₹800 – ₹1,000 | 4–5 years |
3 kW | ₹1,00,000 – ₹1,20,000 | ₹2,400 – ₹3,000 | 4–5 years |
5 kW | ₹1,60,000 – ₹2,00,000 | ₹4,000 – ₹5,000 | 4–6 years |
Subsidies apply only to residential installations up to 3 kW, with additional support for up to 10 kW in some cases.
🌿 Why Go Solar in Assam?
Abundant Sunlight: Assam receives 4.5–5.5 kWh/m²/day, ideal for solar energy.
Government Incentives: Up to ₹78,000 subsidy, zero GST on residential systems.
Rising Power Costs: Solar shields you from rising grid electricity rates.
Environmental Impact: Reduce your carbon footprint by 1–2 tons/year per kW.
🔍 Tips for Choosing a Reliable Solar Company
Ask for local references and check customer reviews.
Avoid installers that pressure you to make quick decisions.
Get at least two quotes to compare pricing and services.
Choose a company offering post-installation support and warranty.
Prefer companies registered with AEDA or MNRE.
✨ Final Thoughts
Installing Solar Panels in Assam is a smart investment in both your future and the planet. By choosing a reliable solar company and following these steps carefully, you can enjoy free, clean energy for decades. Whether you're in Guwahati, Jorhat, Silchar, or a remote village, the solar opportunity is now within reach—both technically and financially.
Start your solar journey today and become a part of Assam’s green revolution!
留言